Texas Data Centers Threaten to Undo Decades of Clean Air Progress, Because Of Course They Do
A new report says Texas data centers could triple soot pollution and spike NOx emissions 136%, undoing decades of air quality gains - because your AI needs to breathe too.
Everything's bigger in Texas, including apparently the air pollution. A new report from the Houston Advanced Research Center (HARC) warns that the rush of new data centers - the physical backbone of generative AI - could bring soot and smog-forming pollutants roaring back to levels not seen since the 2000s in the Lone Star State, which has become ground zero for the infrastructure behind everyone's favorite chatbot.
These new and proposed data centers are demanding a tremendous amount of electricity. How developers and utilities meet that demand - with gas turbines or renewable energy - will determine just how dirty things get. So far, though, things are looking grim. Tech companies and data center developers are devising new ways to get enough electricity, including building out their own power sources. But if all planned data center projects were to plug into the electricity grid in Texas and be powered by the anticipated grid mix, soot and smog-forming pollutants would skyrocket, according to HARC. In just five years, it would be enough pollution to wipe out decades of gains in air quality.
In that scenario, fine particle pollution (soot) from the power sector would more than triple, reaching its highest level since 2006. Smog-forming NOx emissions would increase 136 percent, approaching pollution levels from 2004. Planet-heating carbon dioxide pollution would climb 90 percent above what they were in 2025. "There is a good chance that our children and grandchildren will breathe dirtier air than we did," John Hall, HARC CEO, said in a press release. "The transportation sector, the state, and other stakeholders have been working for decades to successfully bring these [emissions] numbers down, and that progress is now at risk."
That's not set in stone, of course. HARC modeled different outcomes based on three different projections for data center energy demand. Many proposed data center projects are speculative and could fall by the wayside. And developers can limit the environmental impact of a data center by building solar and wind farms onsite. NOx emissions could be up to 10 times lower if data centers pair grid power with renewable electricity generated onsite. But if developers decide to build gas engines on site to power their data centers as a way to avoid long wait times to connect to the grid, the opposite could also play out, resulting in the highest pollution levels possible.
Data center capacity is typically measured by how much power they draw, and Texas has become the leading data center market in this measure with 26 gigawatts of existing and under-construction capacity. Texas is also bracing for four times more proposed data center capacity running on power generated onsite than any other state, according to a separate Wood Mackenzie report published in March. And in many cases, developers are turning to less efficient gas turbine technology in order to speed construction - another trend that's making the data center boom more polluting than it needs to be. Because nothing says progress like trading clean air for faster chatbot responses.
The Good Times
News in your inbox.
One sardonic roundup, delivered on your schedule. Free. Unsubscribe whenever your tolerance for wit runs out.
Already subscribed but we never reach your inbox? Check your spam folder and hit 'Not spam' (or 'Remove from spam') to bust us out of junk-mail purgatory. You'll be helping everyone else too.
Don't open any of our emails for a month and you'll be automatically removed from the mailing list.
Rewrite Article
Select parts to regenerate with a fresh AI pass. Translations will be updated automatically.
Generate AI Image
Creates a sardonic version of the article image using OpenAI.